Electrical Course Description

Electrical designing is a branch of electrical engineering which deals with proposals of size of electrical equipment’s used in building services. Electrical design entails planning, creating, testing or supervising the development and installation of electrical equipment, including lighting equipment, power systems, power distribution, fire and life safety systems. Because electrical design projects can be extensive and very complex, electrical engineers often provide input at every stage, from master planning to the final product. Electrical engineers involved in electrical design must be technically competent with a variety of engineering, design software packages, various laboratory equipment and instruments. They also need strong interpersonal skills to interact with clients and other professionals, including sales & marketing, mechanical engineers, software engineers, research & development, support personnel and others. Most of these professionals have at least a bachelor's degree in electrical engineering or electronics engineering.

Due to drastic changes in electrical industry, need of the skilled electrical people is increasing rapidly. There will be a growth of 24% in jobs for skilled electrical people by the end of this decade. Every space is getting ready for upgradation which needs employees. Electricians with certification are having more career growth. The startup of the career may be same for both certified and uncertified but the career growth and earnings would increase speedily for the one who is certified.

  • Types of electricity
  • Source of electricity
  • Generation, Transmission & distribution of electricity
  • Ohms law
  • Symbols
  • Definitations, Terms & terminologies
  • Important formulas
  • Indian electricity rules
  • National electrical code of India (NEC)
  • National building code of India (NBC)
  • Applicable standards issued by Bureau of Indian standards (BIS)
  • Institute of Electrical & Electronics Engineers (IEEE)
  • Regulations of local fire authorities.
  • Requirements stipulated by Pollution control Board for Noise, Air &
  • Water Pollution
  • Control devices
  • Measuring devices
  • Circuit protection device
  • Ductable Package A/C
  • Transformers
  • Capacitors
  • Bus ducts, Busbars, Cables (HT/LT) & wires
  • Motors & Pumps
  • Luminaries-General & Emergency
  • Isolators & socket outlets
  • UPS/Inverter& Battery banks
  • Earthing or Grounding
  • Lightning arrestor
  • Panels(HT/LT)/Switch Board/Motor control centers (MCC's)/Final Distribution boards (DB's)
  • Cable trays,trunking or raceways, conduits & underground Pipes (Concrete/PVC)
  • Lighting load - Internal & external
  • Utility power load
  • HVAC loads like Chillers, AHU's, FCU's, Pumps, Fans etc.
  • PHE & FF loads like Water transfer pumps, Booster pumps, Fire
  • Fighting pumps, Jockey pumps etc.
  • Lifts (Elevator) load
  • Computer & data centre (Server) loads for office building
  • Load & maximum demand calculation
  • Transformer sizing calculation
  • DG sizing calculation
  • Short circuit calculation
  • Voltage drop calculation
  • Capacitor sizing calculation
  • Cable sizing calculation
  • Earthing calculation
  • Lighting calculation
  • UPS/Inverter sizing calculation
  • Battery sizing calculation
  • Concept design stage:
    • Understanding the building plans, elevations & sections
    • Gathering specific data from the utilities(Electricity board)
    • Understanding clients specific requirements
    • Preparation of basis of design which should include the cost estimate.
  • Schematic design stage:
    • Preparation of Load calculation to arrive maximum peak demand
    • Sizing of all Equipments,cables,cable trays
    • Electrical design calculations
    • Preparation of single line schematic of electrical distribution system with metering options
    • Preparation of lighting, small power, earthing & miscellaneous layouts
    • Preparation of technical specification
  • Detailed design stage:
    • Preparation of detail layouts including sectional details wherever required
    • Coordination with other services like HVAC,PHE & FF layouts
    • Preparation of bill of quantities(BOQ)
    • Issue for tender
  • Construction design stage:(Generally this stage is performed by electrical Contractors)
    • Preparation of shop drawings based on the tender drawings issued by Electrical consultants for installation
    • After installation the entire installation shall be tested & commissioned with the respective authorities
    • As built drawings shall be prepared and handed over to client’s representative

Power utilization has been increasing over the past few years. From the statistics the Power consumption in India is 672KWH in the year 2007 is increased to 884KWH by the end of 2012. To get through this problem the world is looking forward with new concepts such as Net zero and Renewable Energy resources. Because of this, Electrical industry has become one of the rapidly growing industries making pavement for new jobs. And it is one of the most preferred careers over the period.

Up Coming Batches In Hyderabad

6thMay 2017

21stMay 2017

6thjune 2017

21stjune 2017

6thjuly 2017

21stjuly 2017

Up Coming Batch Delhi

6thMay 2017

21stMay 2017

6thjune 2017

21stjune 2017

6thjuly 2017

21stjuly 2017

Up Coming Batch Guntur

6thMay 2017

21stMay 2017

6thjune 2017

21stjune 2017

6thjuly 2017

21stjuly 2017

Enquiry

Up Coming Batch Cochin

6thMay 2017

21stMay 2017

6thjune 2017

21stjune 2017

6thjuly 2017

21stjuly 2017

Enquiry

Up Coming Batch Thrissur

6thMay 2017

21stMay 2017

6thjune 2017

21stjune 2017

6thjuly 2017

21stjuly 2017

Enquiry
certificate
Dhanush partners
Course Name Location Course Fees
INR ₹ USD $
Electrical Design And Drafting Hyderabad 13,500 500
Delhi 17,000 650
Guntur 13,500 500
Cochin 16,500 500

Other Courses

HVAC Training institute
Plumbing Training Institute
AC Technician Course
HVAC Training Online Course